Installing the PXiD-F2 Reinforced Carrier Frame
How to install the Reinforced Carrier Frame for the PXiD-F2. You remove four stock bolts under the seat, attach the frame from the top down with the included bolts, and finish by retightening everything.

- Location of the stock bolts to remove (2 on each side, 4 in total)
- Tips for attaching the carrier frame from the top down
- Retightening after installation, and the finished look
This reinforced carrier frame mounts on the rear of the PXiD-F2. It also serves as a base for the My Basket Carrier and other accessories.
This page covers removing the stock bolts, securing the carrier frame, and retightening.
01 Installing the reinforced carrier frame
-
Remove the stock bolts under the seat (2 on each side, for a total of 4).

-
Attach the carrier frame with the included bolts,working from the top down.


-
After installing the carrier frame, retighten the bolts and you're done.



Use threadlocker as needed during installation. Explanations of tools and general wiring work are omitted. Minor adjustments or workarounds may be needed due to individual differences between bikes. If you are unsure about the installation, be sure to have it done by someone experienced or by a custom shop. For any questions, please reach us through our contact form.
Related articles
*Installation is at your own risk. If you're unsure about doing the work yourself, we recommend consulting your local motorcycle shop.
*The content and photos reflect the time of writing. Please check each product page for current specifications, fitment and stock.


